Designers > K2 Designer for Visual Studio > Design Tools > Toolbox > Wizards Fundamentals > Chaining Wizards | Send feedback |
The InfoPath Client Event and the SharePoint Workflow Integration Client Event cannot run without the configuration of the process. That means the client event is dependant on there being a process event for the wizard to function at runtime. The SharePoint User Management Wizard is an exception.
The chaining of wizards only occurs when the Client Event is dragged onto the design canvas |
The following wizards can be chained:
If the process wizards are dragged onto the design canvas the option to chain the wizard to the Client Event will be presented to the user on the Finished page as shown below. Once the option is selected the Client Event will automatically be opened for configuration.
If the option is not selected, only the process wizard is configured and is not represented on the design canvas by an activity. Rather the process wizard can be reconfigured by selecting the Process tab InfoPath Forms in K2 Studio |
However, if the Client Event is dragged onto the design canvas the respective process wizard will automatically be opened first for configuration. Opening the wizards left side bar will display an icon for the chained wizards. Clicking on the icon will open the process or client wizard.
If the respective Client Event configuration is cancelled the entire chain is cancelled and both wizards will need to be configured again. |
Once the configuration is complete two events will appear on the activity allowing the reconfiguration of each section of the wizard to take place.