To integrate an InfoPath View with the Start of the process: Drag-and-drop the required InfoPath view onto the Start step of the Process.
To integrate an InfoPath View with an Activity in the process: drag-and-drop the required InfoPath view onto the design canvas and configure the following:
To integrate a SharePoint Event with the Start of the process: Drag-and-drop the required SharePoint event onto the Start step of the Process.
To integrate a SharePoint Task with an Activity in the process: drag-and-drop the required SharePoint Task onto the design canvas.
To integrate a SharePoint based Event with the Start of the process: Drag-and-drop the required SharePoint Event onto the Start step of the Process.