Designers > K2 Designer for Visual Studio > Design Tools > Toolbox > Working with Rules > Escalation Rule > Escalation Rules Wizard > Expire Activity Action | Send feedback |
The Expire Activity Action expires the Activity instance. Everything within the Activity execution is stopped, the Line Rules that flow out of the activity are then evaluated and if one of them evaluates to true, that route will be followed next. The status of the Activity is reflected as Expired in the Standard Reports.
The Expire Activity Action has no configuration, after selecting Expire Activity on the Action Template screen, the Finish button can be clicked to finish the wizard.
The Expire Activity Action Template is available in the following areas of the K2 Designer:
Escalation Templates |
Process |
Default Activity |
Event Item |
---|---|---|---|
Expire Activity Action |
|
|